Whole-home install with the stairs in the same mobilisation

Builder-grade flooring and carpeted stairs removed together, replaced with one species and one finish through the whole house.

When this is the job

A newer house delivered with laminate through the main floor and carpet on the stairs. Two contractors would normally do this in two visits, with two finishes that never quite match. One shop, one mobilisation, one finish.

Also called: replacing builder laminate with hardwood · whole house hardwood installation · new build floor upgrade

Published band

From $11–$22 / sq ft installed

HST extra. A range, not a quote — a firm number follows a moisture reading on site.

Worked example

$74,655$105,906

4,200 sq ft plus 14 steps, white oak, Vaughan · 8–14 working days

Typical specification

  • One species and one finish specified across floor and treads
  • Subfloor flatness checked and corrected before any board is laid
  • Transitions designed rather than covered with a strip
  • Stairs and floor finished in the same batch so the sheen matches

Sequence of work

  1. 1Remove existing flooring and stair carpet in one lift.
  2. 2Check and correct subfloor flatness to the mill's tolerance.
  3. 3Lay the field, working from the main sightline.
  4. 4Build the stairs to the same species, matched nosing to the floor edge.
  5. 5Finish floor and treads together, one batch, one sheen.

What goes wrong

The part of a hardwood job that costs money is rarely the part in the quote. These are the failures that produce a second invoice.

Floor and stairs finished in separate batches

Sheen and tone differ at the exact point where the eye compares them — the bottom step. It is the most visible mismatch in the house.

Avoided by: One mobilisation, one finish batch, floor and treads together.

Subfloor flatness accepted as-built

Hollow spots and squeaks across a floor that is otherwise correctly installed, and the mill will decline the warranty claim.

Avoided by: Measuring flatness and correcting it before the first board.

Stairs subcontracted to a second trade

Two warranties, two schedules, and nobody responsible when the tread colour does not match the floor.

Avoided by: One shop that builds both. That is the whole argument for this business.