Floors, stairs, and railings you can inspect in person.
A working selection from Forest Hill restorations, Vaughan new builds, Oakville estates, and occupied GTA condos.
BeforeAfter
Forest Hill, TorontoResidential
Forest Hill heritage restoration
The floors had been screen-coated twice in twenty years and still showed traffic lanes. We sanded to a honest grit sequence, repaired two water-stained boards at the butler's pantry, and finished in a custom walnut toner under a matte waterborne two-component. Stairs were included so the run from foyer to third floor reads as one piece of millwork.
1,850 sq ft
Quarter-sawn white oak
Custom stain
Matched 28 treads
King West, TorontoResidential
King West penthouse herringbone
Concrete plus hydronic radiant is a specification, not a suggestion. We used a 5/8" engineered European oak, the adhesive the mill warrants over heat, and a herringbone field that is actually square to the lake view, not to the longest wall. Floating would have voided the warranty. We did not float it.
2,400 sq ft
Engineered European oak
Herringbone
Radiant compatible
Southeast OakvilleResidential
Oakville estate staircase
The designer wanted a floating look. The inspector wanted a graspable rail and a guard. We drew both, built walnut treads with returned ends, through-bolted the newels, and finished the rail in a hardwax oil that can be repaired without resanding three storeys.
32 steps
Walnut treads
Iron balusters
OBC-compliant rail
Rosedale, TorontoResidential
Rosedale compass rose
Cut in the shop, dry-fitted on a template, then let into a white-oak dining field. The Persian rug was specified after, so the medallion is sized to read when the rug is pulled for holidays — not hidden under it.
48 in medallion
Walnut / maple / cherry
White oak field
BeforeAfter
Richmond HillResidential
Richmond Hill occupied refinish
Occupied unit, two cats, condo quiet hours. Containment, elevator protection, and a waterborne system with a 24-hour sock window. The before photos are why people think they need vinyl. They did not.
1,100 sq ft
Hard maple
Dust containment
24-hour sock traffic
EtobicokeCommercial
Etobicoke dining room
Installed overnight across four nights so the room opened Friday. Ash was chosen because it hides the scuffs a walnut floor would advertise by week three. Maintenance is a monthly clean and a yearly oil, written into the chef's closing list.
Overnight phasing
Wide-plank ash
Commercial oil
Feature wall
VaughanResidential
Vaughan 4,200 sq ft new build
Builder left carpet on stairs and a floating laminate on the main. We pulled both, flattened the subfloor, installed 7" white oak, and site-finished so the stair and the floor are the same formula. Move-in was a Thursday. We were off site Wednesday.
4,200 sq ft
7 in white oak
Site-finished matte
Matched stairs
MississaugaResidential
Mississauga water-damage repair
Insurance wanted a patch. The owner wanted it gone from the photograph. We sourced same-era red oak, acclimated it to the surviving field, and refinished the kitchen as a whole so there is no 'repair island.'
Insurance coordination
Red oak match
Kitchen refinish
High Park, TorontoResidential
High Park hardwood deck
The old cedar had cooked the ledger. We rebuilt the envelope first, then the deck. Pretty boards on a wet rim joist is how you buy the job twice.