Estimate
A real range, then a site visit.
Calibrated to 2026 Greater Toronto labour and mill pricing. We do not lock a number until we have read the moisture in your subfloor.
GTA 2026 range · HST extra
$13,523 – $19,184
About $20 per sq ft at midpoint
Timeline: 5–8 working days
- Floor field · 800 sq ft$15,725
- Includes subfloor prep within 3/16" over 10'. Extreme flattening is extra.
- HST extra. Site measure confirms moisture, transitions, and stair nosings.
Ranges are calibrated to 2026 GTA labour and mill pricing. A site moisture reading is required before we lock a number.
Book the free measure
We typically confirm within one business day. For water damage or a failed inspection, call (416) 847-3366.
