Skip to content
Green Hardwood

Decks · Residential

High Park hardwood deck

Dense hardwood decking, hidden fasteners, cable rail, rebuilt ledger flashing.

High Park, TorontoTorontoHidden fastenersLedger rebuild
Hardwood deck with cable railing at golden hour behind a brick Toronto house.
Hardwood deck with cable railing at golden hour behind a brick Toronto house. Illustrative rendering, not documentary job photography — see how we work.

What the job actually involved

The old cedar had cooked the ledger. We rebuilt the envelope first, then the deck. Pretty boards on a wet rim joist is how you buy the job twice.

Specification

  • Hidden fasteners
  • Ledger rebuild
  • Cable rail

The job type behind this

Each entry carries the published 2026 band, the sequence, and the failure modes that produce a second invoice.

What goes wrong on a job like this

  • Fastening ipe without pre-drilling

    Split boards at the ends, immediately and permanently, in the most expensive material on the job.

    Avoided by: Pre-drilling every hole. There is no exception to this.

  • Cut ends left unsealed

    Checking and splitting at the end grain through the first freeze-thaw cycle.

    Avoided by: Sealing each cut as it is made.

All 3 failure modes for ipe-class hardwood deck

Taking this on in Toronto

Free on-site measure for any qualified hardwood, stair, or railing job.

Toronto is 5 km from the Sterling Road workshop, and 12 of the twelve job types in the catalogue are taken here. Solid white oak on wood joists, engineered over concrete condos, stair retreads in 3-storey semis, and porch restorations on Parkdale and High Park Victorians.

Want this specification in your house?

City, service and size gives you a 2026 GTA band in about twenty seconds. We lock a number only after a moisture reading on site.

Related work

All work · Decks