Fastening ipe without pre-drilling
Split boards at the ends, immediately and permanently, in the most expensive material on the job.
Avoided by: Pre-drilling every hole. There is no exception to this.
Mon–Fri 8–6 · Sat 9–4 · Sun by appointment · Toronto, ON
Most asked for
Carpet to hardwood stairsThe job we are asked for most. What it costs, how long it takes, what changes.
Most asked for
Ontario stair codeRise, run, nosing and handrail limits — with the thresholds quoted, not paraphrased.
Decks
Exterior deck in a dense tropical hardwood, detailed for Ontario's freeze-thaw cycle and fastened so the boards can move without splitting.
A deck rebuild where the owner wants a material that will outlast pressure-treated softwood and is prepared to pay for it. The species is the easy decision; the detailing is what decides whether it lasts.
Also called: ipe deck Toronto · hardwood deck installation GTA · exotic hardwood decking
Published band
From $28–$48 / sq ft for ipe-class decks
HST extra. A range, not a quote — a firm number follows a moisture reading on site.
Worked example
$13,523 – $19,184
420 sq ft ipe deck, Burlington · 1–2 weeks
The part of a hardwood job that costs money is rarely the part in the quote. These are the failures that produce a second invoice.
Split boards at the ends, immediately and permanently, in the most expensive material on the job.
Avoided by: Pre-drilling every hole. There is no exception to this.
Checking and splitting at the end grain through the first freeze-thaw cycle.
Avoided by: Sealing each cut as it is made.
A deck laid tight in a dry winter buckles in July; one laid wide in a wet summer gaps badly in January.
Avoided by: Setting the gap for the moisture content at installation, against the seasonal range.
City, service and size gives you a 2026 GTA band in about twenty seconds. We lock a number only after a moisture reading.