Skip to content
Green Hardwood

Decks

Ipe-class hardwood deck

Exterior deck in a dense tropical hardwood, detailed for Ontario's freeze-thaw cycle and fastened so the boards can move without splitting.

When this is the job

A deck rebuild where the owner wants a material that will outlast pressure-treated softwood and is prepared to pay for it. The species is the easy decision; the detailing is what decides whether it lasts.

Also called: ipe deck Toronto · hardwood deck installation GTA · exotic hardwood decking

Published band

From $28–$48 / sq ft for ipe-class decks

HST extra. A range, not a quote — a firm number follows a moisture reading on site.

Worked example

$13,523$19,184

420 sq ft ipe deck, Burlington · 1–2 weeks

Typical specification

  • Dense tropical hardwood, ipe or equivalent — pre-drilled at every fastener without exception
  • Hidden fasteners or stainless, sized for movement
  • Ventilated substructure with drainage designed in
  • Ends sealed on every cut before installation

Sequence of work

  1. 1Assess and correct the substructure; the boards will outlast it otherwise.
  2. 2Design drainage and ventilation before laying anything.
  3. 3Pre-drill every fastener point. Ipe splits without it, every time.
  4. 4Seal every cut end as it is made, not at the end of the day.
  5. 5Fasten for movement, and set the gap for the season it is being installed in.

What goes wrong

The part of a hardwood job that costs money is rarely the part in the quote. These are the failures that produce a second invoice.

Fastening ipe without pre-drilling

Split boards at the ends, immediately and permanently, in the most expensive material on the job.

Avoided by: Pre-drilling every hole. There is no exception to this.

Cut ends left unsealed

Checking and splitting at the end grain through the first freeze-thaw cycle.

Avoided by: Sealing each cut as it is made.

Board gap set without regard to the season of installation

A deck laid tight in a dry winter buckles in July; one laid wide in a wet summer gaps badly in January.

Avoided by: Setting the gap for the moisture content at installation, against the seasonal range.

Related

Is this your job?

City, service and size gives you a 2026 GTA band in about twenty seconds. We lock a number only after a moisture reading.