Moisture mapping before install

The first trade on a hardwood job is measurement, not the nailer.

Wood-moisture and slab-moisture survey, documented, before Green Hardwood agrees to an assembly.

Technician taking a moisture reading on an OSB subfloor before hardwood installation.

How it is done

  1. Grid the room

    Readings at edges, at plumbing walls, at exterior corners, and in the middle — not one heroic number.

  2. Compare to the material

    Boards have a moisture content. The room has one. The gap between them is the risk.

  3. Write the decision

    Install, wait, change to engineered, or refuse. A smile is not a moisture plan.

Correct when

Every install and every refinish that might have a leak history.

Wrong when

Never skipped because the client is in a hurry.