How it works
Will my hardwood stairs pass inspection?
If Green Hardwood builds them, they are drawn to Ontario Part 9 rise, run, nosing, guard, and graspable-rail rules — or we do not build them. The inspector still has the last word. Use the stair studio for a first pass.
Read the full detail — that page covers method, materials, price band, and warranty rather than the short version.
Related service
Hardwood Stairs
Box stairs, open-riser, replacement treads over carpet, curved flights, and full stair rebuilds. The stair is the first thing guests touch. We treat it as millwork, not leftover flooring.
From $380–$850 per step, installed · Typical 13-step flight: 3–6 days
Stairs in the GTAHow we actually do it
Carpet-to-hardwood stair retread
The volume stair job in Vaughan, Markham, Milton, and Brampton new builds.
Custom box stair build
A hardwood stair built as millwork, not as leftover flooring standing on end.
Open-riser steel and oak stair
Oak treads on a steel carriage — only when the openings and the deflection pass.
People also ask
Want this answered for your house?
A range is a range until someone reads the moisture in your subfloor and measures the flight. Site visits are free across the GTA.